Spectroscopy
Atomic Absorption Spectrophotometer (AAS)
Measures one metal at a time by how much light of that element's own wavelength is absorbed by free atoms in a flame or graphite furnace. Simple, robust and still widely used for metals in pharma QC.
- Pharmaceutical
- Food & beverage
- Environmental
- Mining & metallurgy
- Agriculture
- Clinical

Follow your site SOP
This is a typical operating sequence for learning. Your instrument model and approved SOP take precedence.
STAGE 1
Before you start
- 1Check the calibration status label and the instrument log book.
- 2Check acetylene cylinder pressure; replace the cylinder when the contents gauge falls below the level in your SOP so acetone is not carried into the burner.
- 3Switch on the exhaust above the burner and confirm it is working.
- 4Fit and select the lamp for the element and allow it to warm up (often 10–30 minutes).
- Never light the flame without the exhaust running and the burner head fitted correctly.
STAGE 2
Set-up and optimisation
- 1Set the wavelength, slit width and lamp current from the method.
- 2Ignite the flame following the instrument sequence (air first, then acetylene) and let it stabilise.
- 3Aspirate a mid-range standard and optimise burner height, alignment and fuel flow for maximum absorbance.
- 4Aspirate blank and zero the instrument.
- Keep the drain trap filled with liquid; an empty trap can let flame gases escape and cause flashback.
STAGE 3
Measurement
- 1Run the calibration blank and standards (typically 3–5 levels) and check the correlation coefficient.
- 2Run a check standard to confirm the calibration, then the samples.
- 3Aspirate blank or water between samples to rinse the nebuliser.
- 4Re-run a check standard at the frequency in the method (e.g. every 10 samples) and at the end.
- Dilute samples that read above the top standard; do not extrapolate the curve.
STAGE 4
Shutdown
- 1Aspirate purified water for a few minutes to clean the nebuliser and burner.
- 2Extinguish the flame using the instrument shutdown sequence.
- 3Close the acetylene cylinder valve and bleed the line if required by the SOP.
- 4Switch off lamps and record usage in the log book.
In LimsPulse · Calibration Management
Keep every AAS in control: usage logs, calibration and maintenance schedules, and automatic blocking of overdue instruments.