LimsPulse
Bioanalytical

Gel electrophoresis system

A tank with buffer and electrodes, a gel and a DC power supply. Charged molecules such as proteins or DNA move through the gel in the electric field and separate by size, then are stained and imaged.

  • Biotechnology
  • Biopharmaceutical
  • Academic research
  • Diagnostics development
  • Food (protein profiling)
  • Vaccines
Photo of a Gel electrophoresis system
Photo: Lilly_M, CC BY-SA 3.0 (cropped), via Wikimedia Commons
TROUBLESHOOTING

Common problems, causes and fixes

No current or the power supply shows an error
Likely causes
  • • Lid or leads not connected
  • • Buffer level too low or wrong buffer
  • • Broken electrode wire
What to do
  • • Check connections and the lid
  • • Add correct buffer to the marked level
  • • Inspect and repair or replace the electrode
Bands 'smile' (curve upwards at the edges)
Likely causes
  • • Gel overheating
  • • Voltage too high
What to do
  • • Lower the voltage or run with cooling
  • • Use fresh buffer at the right strength
Smeared or streaked bands
Likely causes
  • • Sample overloaded or contains salt/particles
  • • Protein not fully denatured
  • • Degraded DNA
What to do
  • • Reduce load, desalt or centrifuge samples
  • • Check heating and reducing agent
  • • Use fresh sample and nuclease-free handling
Run is much slower or faster than usual
Likely causes
  • • Wrong buffer concentration
  • • Power supply output drift
  • • Gel percentage wrong
What to do
  • • Prepare buffer again and check conductivity
  • • Verify power supply output with a calibrated meter
  • • Check gel lot and percentage
Faint bands or high background
Likely causes
  • • Too little sample
  • • Old or weak stain
  • • Insufficient destaining
What to do
  • • Increase load within the method range
  • • Prepare fresh stain
  • • Extend destaining or use a more sensitive stain
Distorted or wavy bands
Likely causes
  • • Uneven gel polymerisation
  • • Air bubbles or debris in wells
What to do
  • • Use precast gels or improve casting
  • • Rinse wells before loading
In LimsPulse · Calibration Management

Keep every Gel electrophoresis in control: usage logs, calibration and maintenance schedules, and automatic blocking of overdue instruments.

See how