Dosage-form testing
Disintegration Test Apparatus
Checks whether tablets or capsules break up within a stated time when moved up and down in a liquid at 37 °C. A quick, routine test for release and in-process control.
- Pharmaceutical
- Nutraceuticals and dietary supplements
- Veterinary medicines
- Contract testing labs
Follow your site SOP
This is a typical operating sequence for learning. Your instrument model and approved SOP take precedence.
STAGE 1
Before you start
- 1Check the calibration status label and the bath water level.
- 2Inspect the mesh for tears, corrosion or blockage and check the tubes are clean and intact.
- 3Confirm the method: immersion fluid, temperature, time limit and whether discs are used.
- A damaged mesh lets fragments fall through early and gives a false pass. Replace it before testing.
STAGE 2
Running the test
- 1Fill the beaker with the specified fluid and allow it to reach 37 ± 2 °C; check with a calibrated thermometer.
- 2Hang the basket-rack assembly on the drive arm and confirm the mesh is below the surface at the top of the stroke.
- 3Place one unit in each of the six tubes and add discs if required.
- 4Start the apparatus and the timer together.
- 5Observe the units through the test and record the time at which each has completely disintegrated, or record the state at the stated time limit.
- Do not add discs unless the monograph calls for them; they can make a borderline batch pass.
STAGE 3
Evaluation
- 1If all six units disintegrate within the time limit, the test passes.
- 2If one or two units fail, repeat the test on a further twelve units, as the pharmacopoeia allows; the batch passes if the stated number out of eighteen (commonly not fewer than 16) have disintegrated.
- 3For enteric-coated units, apply the acid stage and buffer stage criteria exactly as written in the monograph.
- Record unusual behaviour such as sticking to the mesh, floating or capsule shells that do not rupture.
STAGE 4
Shutdown
- 1Remove the rack, empty the beaker and rinse the tubes, mesh and discs with purified water.
- 2Dry the parts and store the rack hanging or supported so the mesh is not damaged.
- 3Complete the usage log.
In LimsPulse · Calibration Management
Keep every Disintegration tester in control: usage logs, calibration and maintenance schedules, and automatic blocking of overdue instruments.